Our CNG Plant is located at Muaro Jambi, Sumatra, measuring approximately 11,200 sq. metres. This facility is equipped with metering station, gas dryer, gas compression, control room, microturbines, CNG buffer storage, air compressors and a CNG filing station. It is the first CNG plant in Sumatra and supplying CNG to the industry area within 300km […]
On 28 April 2016, Konsortium Amanie was awarded a contract from the State Government of Terengganu for the design and build of 120 million litres per day (“MLD”) and 28 MLD membrane water treatment plant, intakes, service tank, installation of raw water and clean water pipes, retrofitting and other works for the Kuala Terengganu Utara […]
The thrust behind the establishment of the proposed 45 MTPD Chlorine Skid Mounted Chlor-Alkali Plant is to cater for the increased demand of the product in the water utilities and other growing industries in Tanzania and in East African Region as well as to Island of the Indian Ocean.
Our vision is to create Malaysia’s 1st maintenance, repair and overhaul (MRO), and inspection, repair and maintenance (IRM) Global Centre of Excellence for the downstream oil, gas and petrochemical, and power generation industries.